武汉盘龙正荣府(示范区)展示中心照明工程——2021神灯奖申报工程

大件事要分享到:
2021-03-10 70

摘要:武汉盘龙正荣府(示范区)展示中心照明工程,为北京光影国际照明设计2021神灯奖申报工程。



  项目名称:武汉盘龙正荣府(示范区)展示中心照明工程


  此项目为2021阿拉丁神灯奖工程类参评项目


  申报单位:北京光影国际照明设计


  项目地址:湖北省武汉市黄陂区盘龙大道


  设计单位:北京光影国际照明设计


  施工单位:金龙腾装饰股份有限公司


  业主单位:正荣地产-武汉正舟置业发展有限公司


  项目简介


  融情于景,融匠心于建筑。建筑精研城市文化,采用具有张力的、现代化的建造风格,石材和金属的搭配给予了建筑深刻的视觉感受,配合现代感极强的玻璃材质,使建筑整体虚实结合的手法更加明确;
建筑形态的展现、材质的选择呈现其建筑特色形象的同时, 也为周边提供了一种全新的生活场所,契合项目所处区域的发展趋势。

Melt in the scene, melt craftsmanship in the building. Elaborate on urban culture, the building adopts a tension and modern construction style. The collocation of stone and metal gives the building a profound visual feeling. With the strong sense of modern glass material, the technique of combining the virtual and the real in the whole building is more clear.

The display of architectural form and choice of materials presents its architectural acteristic image, but also provides a new living place for the surrounding area, which conforms to the development trend of the area where the project is located.











项目宣传视频:

  照明技术指标


  线形灯:功率15W 色温4000K 数量100米
线形投光灯:功率24W 色温4000K 数量46米
LED柔性灯带:功率9.6W 色温4000K 数量130米
嵌入式筒灯:功率10W 色温3000K 数量21套
定制壁灯:功率18W 色温4000K 数量5套
LED投光灯:功率3W 色温4000K 数量4套

供配电系统
1.本工程为220/380V供配电系统,采用放射式供电方式;
2.计量:夜景照明配电系统均在上级配电箱(柜)进行计量;
导线选择和线路敷设
所有供配电线路和控制线路必须按设计规范要求穿厚壁热镀锌钢管或金属线槽敷设,任何地方都不能出现裸导线的情况,更不能把供电线路直接埋在地面和墙体内;
2. 照明线路采用WDZB-YJY-1.0KV铜芯无卤低烟B级阻燃交联聚乙烯绝缘电力电缆;低压线路采用ZR-RVV阻燃铜芯电缆;
3. 电缆分支或有破开处须设防水接线盒并离地0.3m安装;敷设管线应在适当位置加拉线盒(直线:30m,一个弯:20m,二个弯:15m,三个弯:8m);4.管线埋地敷设时埋地深度不小于0.7m,在寒冷地区电缆宜埋设于冻土层以下;所有穿过建筑物伸缩缝、沉降缝、后浇带的管线应按《建筑电气安装工程图集》中有关作法施工;
设备要求:
1)照明设备所有带电部分应采用绝缘、遮拦或外护物保护,距地面2.8m以下的照明设备应使用工具才能打开外壳进行光源维护;
2)室外安装照明配电箱与控制箱等应采用防水、防尘型,防护等级不应低于IP54;
3)室外配电箱内元器件应考虑室外环境温度、湿度的影响,距地面2.8m以下的电气设备应借助于钥匙或工具才能开启;
4)LED灯具应选用专用开关电源,LED灯具输入电压应与开关电源输出电压一致;
5)在正常视角范围内的光源可直视灯具,必须采取有效防眩光措施;
6)对人员可触及的照明设备,当表面高于60℃时,必须采用隔离保护措施;
7)灯具、附件及电气设备满足项目所在地气候环境条件下正常工作;
8)夜景照明灯具防护等级必须满足消防安全要求;室外雨棚嵌入式筒灯防护等级不低于IP44,水下灯防护等级不低于IP68等;
9)所有I类灯具均设置地线接地保护;
10)灯具功率因数不应低于0.9,以减少线路损失,确保供电质量及光源效率.
时间控制器系统要求:
1)开、关时间任意可调;
2) 已调好的开、关时间不受停电影响,自动记忆;
3)每天可做十次开、关动作,开、关时间一周内可任意编程;
4)可自动,也可手动控制,设有自动保护装置;
5)内消耗功率低;
施工安装要求:
1)夜景照明灯具及配套电器、开关电源、控制器等电气设备禁止安装在可燃材料表面;
2)开关电源、各种控制器必须按照施工设计规范要求安装在金属外壳的箱体内,不得埋在地面和墙体内;
3)灯具的电缆电线接头应端子连接或涮锡连接、并做防水处理;
4)为了保证安装强度和防止雨水腐蚀,灯具安装支架、固定螺丝应全部为不锈钢或铝合金材质;
5)灯具、管线及电气设备布置不得影响消防安全疏散与救援;
6)室外灯具外壳颜色应与安装部位表面颜色协调;外立面夜景照明灯具及布线应做到不外露、不易触碰到,主立面严禁外露;
7)所有供配电线路和控制线路必须按设计规范要求穿厚壁热镀锌钢管或金属线槽敷设,任何地方都不能出现裸导线的地方,亦不可直埋于地面或者墙体内;
8)施工满足项目所在地的地方标准及施工规范要求;
Linear lamp: power 15W color temperature 4000K quantity 100 meters

Linear projection lamp: power 24W, color temperature 4000K, quantity 46m

LED flexible light strip: power 9.6W color temperature 4000K quantity 130 meters

Embedded down light: power 10W color temperature 3000K quantity 21 sets

Custom wall lamp: power 18W color temperature 4000K quantity 5 sets

LED projection light: power 3W color temperature 4000K Quantity 4 sets



Power supply system

1. This project is 220/380V power supply and distribution system, using radiation power supply mode;

2. Metering: Nightview lighting distribution system are measured in the superior distribution box (cabinet);

Conductor ion and circuit laying

All power supply and distribution lines and control lines must be laid through thick wall hot dip galvanized steel pipe or metal trough according to the requirements of the design specification. Bare wires can not appear anywhere, let alone the power supply lines directly buried in the ground and walls;

2. The lighting line adopts WDZB-YJY-1.0kV copper core halogen-free low-smoke B-grade flame retardant XLPE insulated power cable; ZR-RVV flame retardant copper core cable for low voltage line;

3. Water proof junction box shall be set up at cable branch or broken place and shall be installed 0.3m above the ground; The pipeline should be laid in the appropriate position of the wire box (straight line: 30m, one bend: 20m, two bend: 15m, three bend: 8m); 4. The buried depth of the pipeline should not be less than 0.7m when it is laid in ground. In cold areas, the cable should be buried under the permafrost; All the pipelines through the expansion joints, settlement joints and post-cast belts of the building shall be constructed according to the relevant practices in the Atlas of Building Electrical Installation Engineering;

Equipment requirements:

1) All live parts of the lighting equipment should be protected by insulation, shielding or external protection. The lighting equipment below 2.8m the ground should use tools to open the shell for light source maintenance;

2) Outdoor lighting distribution box and control box should be waterproof and dustproof, and the protection grade should not be lower than IP54;

3) The components in the outdoor distribution box should consider the influence of outdoor environment temperature and huity, and the electrical equipment below 2.8m the ground should be opened with the help of keys or tools;

4) LED lamps should use special switching power supply, and the input voltage of LED lamps should be consistent with the output voltage of the switching power supply;

5) The light source within the normal viewing Angle can look directly at the lamp, and effective anti-glare measures must be taken;

6) For lighting equipment accessible to personnel, when the surface is higher than 60℃, isolation protection measures must be adopted;

7) The lamps, accessories and electrical equipment should work normally under the climatic and environmental conditions of the project location;

8) The protection level of nightview lighting fixtures must meet the fire safety requirements; The protection level of outdoor canopy embedded downlight should not be lower than IP44, and the protection level of underwater light should not be lower than IP68;

9) All Class I lamps are equipped with ground wire grounding protection;

10) The power factor of the lamp should not be less than 0.9 to reduce the line loss and ensure the quality of power supply and the efficiency of the light source.

Time controller system requirements:

1) Opening and closing time can be adjusted;

2) The adjusted on and off time is not affected by power failure, and it can be automatically remembered;

3) Can do 10 times a day on and off action, on and off time within a week can be arbitrary programming;

4) It can be controlled automatically or manually, and equipped with automatic protection device;

5) Low internal power consumption;

Construction and installation requirements:

1) Nightview lighting lamps and supporting electrical appliances, switching power supply, controllers and other electrical equipment are prohibited to be installed on the surface of combustible materials;

2) Switching power supply and various controllers must be installed in the box of the metal shell in accordance with the requirements of the construction design specification, and shall not be buried in the ground and wall;

3) The cable and wire connectors of lamps and lanterns should be connected with terminals or dipping tin, and waterproof treatment;

4) In order to ensure the installation strength and prevent rain corrosion, the mounting bracket and fixing screws of the lamp should be made of stainless steel or aluminum alloy;

5) Layout of lamps, pipelines and electrical equipment shall not affect fire safety evacuation and rescue;

6) The exterior lamp shell color should be in harmony with the surface color of the installation part; External facade night lighting lamps and wiring should be not exposed, not easy to touch, the main facade is strictly prohibited exposure;

7) All power supply and distribution lines and control lines must be laid through thick-walled hot-dip galvanized steel pipes or metal grooves according to the requirements of the design specifications. No bare wires can be found anywhere, nor can they be directly buried in the ground or walls;

8) The construction shall meet the local standards and construction specifications of the project site;


  节能措施及效果


  项目设计:灯光为建筑服务,用适量的灯具针对建筑做合适的照明。
产品运用:贴合绿色照明,每款灯型确保功率合适,无运用大功率灯具;同时极大地减少了视觉上的曝光点及过度照明。
控制模式:采用成熟的时间控制模块,将建筑照明分为夜晚和深夜两种模式(夜晚灯光状态全开深夜只保留基础功能),照明内消耗功率低;
Project design: lighting for the service of the building, with the right amount of lamps for the building to do appropriate lighting.

Product application: fit green lighting, each lamp type to ensure appropriate power, no use of high-power lamps; It also greatly reduces visual exposure points and overillumination.

Control mode: a mature time control module is adopted to divide the lighting of the building into two modes: night and late night (the lighting is fully switched on at night and only the basic functions are retained at night). The power consumption in lighting is low.


  照明设计创新点


  照明设计思路的转变:营销中心不再仅仅是传统的销售场所,“体验”是新消费场景的核心;去“销售”化的售楼处,多了些趣味、少了些功利,让人们在各类极致的体验中,自然而然地加深了对项目的理解、认可以及对新生活的畅想;而灯光的介入是对建筑结构的描绘、对氛围的渲染、对体验感的提升。

The transformation of lighting design idea: marketing center is no longer just the traditional sales place, "experience" is the core of the new consumption scene; To the "sales" of the sales office, more interesting, less utilitarian, so that people in all kinds of extreme experience, naturally deepen the understanding of the project, recognition and imagination of the new life; The intervention of light is to describe the structure of the building, to render the atmosphere, to enhance the sense of experience.


  项目实际运行评价


  我司于2019年11月22日至2020年07月20日进行“武汉盘龙正荣府”示范区项目灯光设计及验收调试工作;通过现场检测、调试等方式,现场灯具安装齐全,灯具无损坏,功率及照射角度满足设计需求,各回路供电正常,调光回路运行正常,符合甲方设计需求。

Our company in November 22, 2019 solstice on July 20, 2020 "Wuhan Panlong Zhengrong House" demonstration area project lighting design and acceptance debugging work; Through on-site inspection, debugging and other methods, the lamps and lanterns on site are fully installed, the lamps and lanterns are not damaged, the power and irradiation Angle meet the design requirements, the power supply of each circuit is normal, and the dimming circuit runs normally, which meets the design requirements of Party A.



  获奖情况


  


  申报单位


  光影国际照明设计是由郑志伟先生领衔的顶尖设计团队。十余年来,专注于光环境设计与研究,服务于商业地产、城市地标、酒店会所、办公康养、文旅小镇等全球精品项目。以国际视野和世界领先的灯光方案,完成众多视觉艺术与商业价值兼备的光影作品。

Light & Shadow International Lighting Design is a top design team led by Mr. Cheng Zhiwei. For more than ten years, we have been focusing on light environment design and research, serving commercial real estate, city landmarks, hotels, clubs, office health, cultural tourism town and other global boutique projects. With an international perspective and world-leading lighting solutions, he has completed numerous light and shadow works with both visual art and commercial value.